Commercial


South University Office BuildingSouth University Office Building
Date: 2014   Location: Centennial
Area: 19,000 SF   Cost: $1,900,000

New, two-story building featuring brick construction, elevator, six, individual units, covered and surface parking.


South Broadway Medical BuildingSouth Broadway Medical Building
Date: 2004   Location: Littleton
Area: 22,000 SF   Cost: $2,100,000

New, two-story medical office building with surgical center. Steel and stone construction, elevator, four individual suites.


Champa TerraceChampa Terrace
Date: 2013   Location: Denver
Area: 10,000 SF   Cost: $900,000

New, multi-family housing unit developed in Curtis Park historic district.  Kitko Construction was the general contractor, offering ground-up building services.  This high-end, four-unit custom townhome project met tight budgetary restrictions and quick turnaround time for the sales process.


Champa TerraceArvada Presbyterian Church
Date: 2013   Location: Arvada
Area:     Cost: $120,000+

Kitko Construction has been the church’s  trusted contractor for nearly ten years.  The latest project included the addition of second floor office space and and an elevator connecting the two stories.


image coming soonAdvanced Oral Maxillofacial Surgery Center
Date: 2004   Location: Littleton
Area:  3,000 SF   Cost: $275,000

Construction of the high-end medical surgeon’s operatory and office.  Included medical gas equipment necessary for surgical procedures.


image coming soonDr. Scott Ohmart Dental
Date: 2004   Location: Littleton
Area:  3,000 SF   Cost: $270,000

Construction of high-end orthodontic medical space.  Included air, vacuum, and gas systems necessary for medical and dental procedures.


image coming soonSkylark Lounge
Date: 2003   Location: Denver
Area:  8,000 SF   Cost: $200,000

An old building on South Broadway was gutted and renovated to suit live bands and bar environment.